11 29 20 Deer 1000x756

It’s not environmentalists—it’s the nuclear-power industry itself.

Kairos Power’s new test facility is on a parched site a few miles south of the Albuquerque, New Mexico, airport. Around it, desert stretches toward hazy mountains on the horizon. The building looks like a factory or a warehouse; nothing about it betrays the moonshot exercise happening within. There, digital readouts count down the minutes, T-minus style, until power begins flowing to a test unit simulating the blistering heat of a new kind of nuclear reactor. In this test run, electricity, not uranium, will furnish the energy; graphite-encased fuel pebbles, each about the size of a golf ball, will be dummies containing no radioactive material. But everything else will be true to life, including the molten fluoride salt that will flow through the device to cool it. If all goes according to plan, the system—never tried before—will control and regulate a simulated chain reaction. When I glance at a countdown clock behind the receptionist during a visit last May, it says 31 days, 8 hours, 9 minutes, and 22 seconds until the experiment begins.

Read the article at theatlantic.com

Hopes to slash emissions using nuclear energy are being dashed by U.S. regulators.

For anyone hoping to reboot the nuclear power sector as a source of zero-carbon energy in the age of climate change, the news has not been good. On Feb. 28, the staff of the U.S. Nuclear Regulatory Commission (NRC) forwarded a proposed licensing framework for next-generation reactors to the agency’s five politically appointed commissioners. That proposal came little more than a year after the NRC summarily rejected Oklo Power’s license application for its Aurora reactor. The application was the first attempt to obtain a license to operate an advanced nuclear reactor in the United States.

Read the entire article at foreignpolicy.com